Movesa S.A


Go to content

Carbon steel workshop

Installations




Within a 9,000m2 area which it has in Camarma de Esteruelas, Movesa uses as a Carbon steel Workshop a 1,500m2 industrial unit.

This industrial unit is equipped with the equipment required to allow Movesa to carry out light, medium and heavy boilermaking works using carbon steel of different qualities, as well as the manufacture of metallic structures.

As regards the equipment, it is worth highlighting the two 10-tonne bridges cranes, a 3-metre wide cylinder which is up to 25 mm thick, submerged arc welding column which is 4 metres in diameter, large-diameter turning gear, 300-tonne folder, shear cutter etc.

AnteriorPlaySiguiente

Back to content | Back to main menu